60 acres · Ngari we Ireri, Mbeere North
Area-level guidance from public records — not a survey of this parcel.
Land details
- Water
- Seasonal river · 0.50km
- Features
- 500m to thura river, 20km from Ishiara town
About this land
60-acre land near Ishiara, suited to large-scale farming or grazing. It is 500m from Thura River; tenure, road access, power and terrain are not stated.
📝 From the seller (as posted)
💼 Area economy
Specific evidence for Iria-Itune records drought, planned drought-tolerant cropping and livestock-breed improvement, rather than a verified list of profitable crops. Do not assume dependable rain-fed horticulture or irrigation on a parcel. Mikameri cattle watering place is documented locally. Ngari Ireri, Karangine and Kiogogo are documented market sites; reliable published market days were not found. Ask locally about water costs, buyers, produce collection and livestock trading before purchase.
Ngari Ireri Market is a gazetted county asset in Iria-Itune; Karangine and Kiogogo markets are also documented in the same registration section. This confirms market sites, not trading volume, market-day schedules, produce prices or public-transport frequency. A buyer should not value land as commercial frontage without visiting on the actual trading day; no reliable published source found the market days.
🚧 Development nearby
County project records list Muminji EWASCO-line extensions, a Nthawa borehole and Kamugu–Nthawa pipes as complete by June 2026. This does not prove a water main, pressure, meter or legal connection at a specific plot; verify with EMBEWASCO locally.
Source: Embu County water projects report · Jun 2026Embu County's FY2024/25 implementation review recorded the Ishiara market upgrade and completion of Ishiara livestock market. This supports trading activity, but it does not create a guaranteed buyer or price for farm output.
Source: Embu County Budget Implementation Review Report FY 2024/25 · Apr 2026Embu County advertised construction of an Ena fresh-produce market to improve market participation. A tender is not a finished market; land cannot rely on this outlet until a contractor mobilises and the facility opens.
Source: Embu County Government Tenders: Construction of Ena Fresh Produce Market · Mar 2026The NDMA January 2026 bulletin recorded the Evurore–Kanyuambora expansion as 60% done but stalled. Land nearby cannot rely on scheme water, crop plans or resale uplift until works restart and service terms are confirmed.
Source: Embu (Mbeere) Drought Early Warning Bulletin, January 2026 · Feb 2026The Irrigation Department reported Kamata at 40% in November 2025 and targeted completion for July 2026. As that target has passed without a newer completion notice, do not assume irrigation water is available to a parcel.
Source: Inspection tour of the Kamata Irrigation Project and Household Irrigation Projects in Mbeere North Sub-County · Nov 2025🗺 More land in this area
📍 Pin shows the general area — exact location shared on enquiry. Facts are area-level guidance from public records, not a survey of this parcel. "Seller info" means details are as given by the seller, not yet checked by us — ask about verification.